Quick answer
Quick answer: back up the original, pick the right format/settings, run a small batch, spot-check the output. Type/leak/remediation/permits drive total.
Why it matters
Get the shortest path working before optimizing.
Type.
Step by step
- Check type/location/leak/testing/permits/soil.
- Separate removal/testing/soil/groundwater/backfill.
- Get 2-3 quotes; confirm scope/testing/remediation.
- Contract states scope/permits/payment/warranty.
Common mistakes
- Removal price only, not contamination/remediation.
- Ignoring permits/testing/soil.
- Not checking underground/leaks.
- No remediation/payment terms.
Checklist
- Type/location/leak/testing/permits.
- Removal/testing/soil/groundwater/backfill.
- Oil/water/soil/report.
- Warranty/payment/contract.
- Budget/remediation/resale.
Key facts
- Type.
- Leak.
- Remediation.
FAQ
What is the quick answer for Cost factors?
Quick answer: back up the original, pick the right format/settings, run a small batch, spot-check the output. Type/leak/remediation/permits drive total.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: EPA